Well, haven't updated this thread in a bit so i thought i'd do it now

New point is installed and another has been installed on the other side for a passing loop.
A new loco and a new Coop refrigerator wagon has been delivered to the layout.
Observation coaches were borrow from the DVRR for a special outing.
Snow came this year to the layout.. I decided to See if i could get rid of the snow with 652, didn't really work :thumbdown:
Another refrigerator Coop wagon (Strawberry( arrived on the layout a few weeks ago.