SGR said:I'm trying to sort a reverse loop for a friend and I think I've sorted it. Attached is a very rough plan and I think I should cut the rails at the red lines and put the reverse loop between them. Am I right?
SGR said:I'm trying to sort a reverse loop for a friend and I think I've sorted it. Attached is a very rough plan and I think I should cut the rails at the red lines and put the reverse loop between them. Am I right?
In the case of the loop being short, then you coould move your track breaks further away as per this amendment to your diagram.whatlep said:SGR said:I'm trying to sort a reverse loop for a friend and I think I've sorted it. Attached is a very rough plan and I think I should cut the rails at the red lines and put the reverse loop between them. Am I right?
YES!![]()
Only alternative would be to have the "loop" section entirely on the curve on which your rightmost red line sits. I guess that you've already IDed that it would be too short for a typical train?
SGR said:Thanks for that confirmation. I have been looking at this for some while and then on Sunday morning, after a good cooked breakfast, I had that eureka moment. Just need to implement it but won't be visiting there for a while. Which is better, the Massoth double break system or the original single break type?