I didn't bother given the tolerances I was working to, plus I used long lengths of track where possible and all the curves are R1 so there is a little gap at each join by hazard rather than design.
Now the concrete base moving because the bushes I planted have grown amazing roots really is a problem.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.