We are planning to partially automate a garden layout using the ZIMO MX 10 and StEin units for block detection and iTrain for automation.
The plan is to use single core 2.5mm solid copper cable with crimp connectors onto Massoth single screw track connections as feedback from each block to the StEin. (I have discussed with Split Jaw products re their connectors, I like the idea but between shipping, import and VAT they are expensive) The cable will be protected in a small diameter flexible tube as used by electricians in new buildings. The tubes will be laid on the surface and covered in a thin layer of gravel. The tubes will not be moved but may be subject to some disturbance. Minimum length of cable will be around 25 meters (80 Ft) max length around 45 meters (150 Ft).
I tried using solid plastic conduit but it doesn't work well as any movement moves the complete pipe, it would work if buried properly but this is not possible.
Question No 1 solid copper or multi core cable?
The cables will be Radial from a point around 20 meters from the base station / StEin units which means cables bunched together for around 20 meters. The bunched cables will follow a single track access ramp to a garage storage area where the cables pass through a wall and under the base board. There will be 14 separate cables bunched together either in one bundle or in smaller bundles.
Question 2
As all cables are carrying the DCC signals will we have a problem of interference between the cables when bunched over a fairly long distance?
Robin
The plan is to use single core 2.5mm solid copper cable with crimp connectors onto Massoth single screw track connections as feedback from each block to the StEin. (I have discussed with Split Jaw products re their connectors, I like the idea but between shipping, import and VAT they are expensive) The cable will be protected in a small diameter flexible tube as used by electricians in new buildings. The tubes will be laid on the surface and covered in a thin layer of gravel. The tubes will not be moved but may be subject to some disturbance. Minimum length of cable will be around 25 meters (80 Ft) max length around 45 meters (150 Ft).
I tried using solid plastic conduit but it doesn't work well as any movement moves the complete pipe, it would work if buried properly but this is not possible.
Question No 1 solid copper or multi core cable?
The cables will be Radial from a point around 20 meters from the base station / StEin units which means cables bunched together for around 20 meters. The bunched cables will follow a single track access ramp to a garage storage area where the cables pass through a wall and under the base board. There will be 14 separate cables bunched together either in one bundle or in smaller bundles.
Question 2
As all cables are carrying the DCC signals will we have a problem of interference between the cables when bunched over a fairly long distance?