Building The NSLR Bridges

Nice to see this thread continue over here Nico.
Keep it going :D
 
Amazing Nico, simply amazing. :)
 
Would longer wellies be a good idea Nico
 
Would longer wellies be a good idea Nico
 
Very impressive indeed, Nico. :applause:

I presume you don't have the same issues with flooding from your stream that I do?
 
How bad is your flooding, at the moment my stream is flooded i would need waders i wouldn't mind the height of the water its the speed of it,
 
nico - 27/10/2009 5:57 PM

How bad is your flooding, at the moment my stream is flooded i  would need waders i wouldn't mind the height of the water its the speed of it,

This was the footbridge across on 21 July 2007. It had been completely submerged during the previous night and attacked by uprooted tree trunks up to 2 feet in diameter. That's why the layout stays on one side!
 
Nice on Nico :D
 
Feel free to send some this way, were still in a serious drought here :thumbdown:
 
Bram - 27/10/2009 5:41 PM

Would longer wellies be a good idea Nico

So funny he had to say it twice :rofl:
 
nico said:
then allthe top sections connected to 15'9" /4800 lenght x 5 3/4"/148x 1 3/4"/44 treated timber plank

In reply to a question i got, i forgot to mention that i connected a lenght of 20cm box iron under the timber plank to stop it from warping :clap: