Eighton Bahn AKA testing testing RhB

Well after a couple of bags of fill, compost/soil, the plants (8) are in...

20260421_132713[1].jpg

...hopefully the ones next to the wall will trail over it, but knowing my lack of green fingers they will all die.o_O
 
Over the last few days, managed to do the first running sessions of 2026, more of a testing of the tunnel mouths, but with the distance viewing reversing point incicators also tested out, bit of a failure in that one, they do work but carn't be seen form the normal viewing position...

20260426_150914[1].jpg

20260426_151106[1].jpg

20260426_151305[1].jpg

20260426_151004[1].jpg

...I should have painted the inside the tunnels black, but I am sure a couple of rattle cans will sort it...

20260426_172017[1].jpg

...as well as observing the wildlife.:)
 
Last edited:
More testing today, well you need to continue to ensure the recent works are fit for purpose...

P1040605.JPG

P1040607.JPG

P1040608.JPGP1040610.JPG

P1040613 - Copy.JPG

P1040614 - Copy.JPG

P1040615 - Copy.JPG

Have had to swap over a new point motor as it too stiff to be reliable enough to return the switch blades to the main line, from the reversing loop setting, causing trains to split the point and derail. The replacement, an older spare point motor, is slack enough to make it an reliable throw. One strange thing of note though, was that it had to have the power feeds swapped around to get the matched setting to it's twin.
 
Last edited:
Back
Top Bottom