I have been doing a little work over the past few months on the layout and have failed to do updates.
I have included a shuttle branch line with a second terminus.
I am using Heathcote Electronics Irdot-1 and route control to switch the LGB points.
These shots are prior to any landscaping
This is after, I have used a combination of carved polystyrene, plaster castings and foam rocks.
Yesterday (Saturday) I spent the day watching a Bachmann tram shuttling up and down, very relaxing.
All that remains to do is ballasting, scenery, buildings, people and vehicles.
Only a couple of years work, should keep me of the streets for a while.