JRinTawa
Member of the Wellington Garden Railway Group
Wet weather caused the Wellington Garden Railway Group's planned running day to be transferred to a large indoor G gauge railway owned by member Wayne H.  Pretty good place to end up on a wet sunday 
 
		
		
	
	
		
	
  
The Railway starts at a low level terminal station, where the main loco depot is.
 
		
	
  
Wayne scratch build's most of his rolling stock, much true to prototype plans, some a little bit freelance. Some here lined up under the track linking the various levels of the railway and the central loop around the 7mx7m room.
 
		
	
	
		
			
		
		
	
				
			The Railway starts at a low level terminal station, where the main loco depot is.
Wayne scratch build's most of his rolling stock, much true to prototype plans, some a little bit freelance. Some here lined up under the track linking the various levels of the railway and the central loop around the 7mx7m room.