First really nice day of 2011, so trains have been running today on the WGLR.
Tramway diesel out first, taking the Lowmacs (properly loaded and secured) to the yard ready for the Perway gang's night time possession.
Passing over Foggy Bottom viaduct.
Then through The Narrows.
Finally shunted into the yard, allowing a passenger service to pass.
Tramway diesel out first, taking the Lowmacs (properly loaded and secured) to the yard ready for the Perway gang's night time possession.
Passing over Foggy Bottom viaduct.

Then through The Narrows.

Finally shunted into the yard, allowing a passenger service to pass.
