The Long Dream Line recovery

UKSGR

Registered
Country flag
Some of you may remember these pictures from last year.
218119bd715e4ab8833e3668a086a20b.jpg
baccb068387f4ef8853c39028207e948.jpg
Obviously something had to go and fortunately the higher planning approval officer agreed to it being the bamboo. After plenty of blood, sweat, tears and tea, it was gone. We left it a while but there was no return so plans were made to recover the right of way and now we're at this stage.
b6b7c7ed62884e9483993277d202f949.jpg
589d88c685e4481681b0f2081f6748f0.jpg
a7f9a84fbdc448c8bf1c18c90492a428.jpg
As things progress I'll post more pictures.
 
Great looking trestles can't wait to see the finished bridge :thumbup:
 
I agree the trestles look great. I cant wait to see more pictures of your progress. looks like its going to be a good size layout with a lot of options. Good stuff so far.
I like the overgrown look with the bamboo tree growing through the tracks. Im doing that with one of my sidings, letting nature take over.
 
A little progress today.
2de520a3b9f7492097e9482482587c69.jpg
ee9d0770549f4419bda11d6531436d26.jpg
08628b0b3b274f35b5b8deee197cf3e0.jpg

I have also cut and preserved most of the stringers to go between the bents but still have the top runners to cut. With the evenings getting lighter here I might be able to do some in the evenings this week.
 
Well, with work and other stuff (including a visit to UK) nothing has happened till today. However, the gang were out in the blazing sun to make good progress.
575708da71e446a19a48abcda596dfd6.jpg

02203b83a626445f978b9bedd6a777ef.jpg

7bc0ccbb6d6549969774114cb4418b43.jpg

04698830bced4d4ba7767ec1f4831b8b.jpg

8d1214aed50140999b2167f35cd3eefd.jpg

They worked well into the evening trying to get to a state where it is hoped to finish tomorrow:rolf:
0c29a6b0632848759d795a177e0d52ef.jpg
 
Back to work in the searing heat (32C) they managed to complete the link.
761d483bc3df441e8ed1767f27db1983.jpg

Then the clearing up had to be done.
9fa35e36eb864fc8b8994673c09a9a94.jpg
48f28d74459548be9bc4d034db031735.jpg

Next was cleaning the new line.
397921ec7f89455d832cda76fd310a3f.jpg
556d1cb4e5384ca3be13a967baf49424.jpg
1c15b05bef0e47099fd3b5b052bb6eea.jpg
 
Once the track crew were back at the depot, everyone awaited the departure of the Yobbit with the 1st official passenger train.
00357be899484606adcef320e8cf588a.jpg

Approaching the new line.
2c30ec2801b04e50bd82a1449b491404.jpg

All seems well.
9a72b9ccb66a4671824aae91f4f01821.jpg
50da3679acf44e199c6a82ab4887083e.jpg

Round the top to join the old section.
b69be1ffd49b4273b1e1dd8d5bb613ee.jpg
b67ba38dfed042ddadb581a33ae1bf89.jpg

Then down the hill to the old Howe Truss bridge.
14a3502f492a4a1e9f27bebd9eed1d46.jpg
523f236aa12d4546af7f0da3594afb8e.jpg

meanwhile, Litlun took the rubbish wagon to the dump via the mountain line.
6814a48874a8481d95b4bf804cd1be72.jpg

It's taken a while but I think it was worth the wait. Next step is to extend somewhere.:)
 
I didn't realise how long it's been since the line was re-opened. The extensions have not gone far but things are starting to move slowly again. Meanwhile there was a good running session last weekend. 1 of the extensions needed ballast moved in from other areas.
0cf4facec3f14c5e9ee78908a1e2aa2d.jpg
707d5ce6f2ec4e18a34856330679f274.jpg
08510088c7c74d828ed042d011f0fe76.jpg

The passenger express ran during track maintenance breaks.
a2193eb61ccd4881b92be32712227e0f.jpg
4d3e1f7aed2e4227a1264d5a699124e6.jpg
e396378c0e0d424cbbee67cca522e1d5.jpg
f49e6c026e3444d5bcfd950b58c2cc41.jpg

And at the end of the day the maintenance train was commandeered by upper management for special duties.
47badd9274d540b296b784245a28903d.jpg
471d3eb736ae42f7ba6b9ba8ec7e1baf.jpg

All in all a good day.:):thumbup:
 