pictures past & present

61edc7b62bbc47ac814393ffa6eddd62.jpg


8ba8d9fab8ad4729a70ec9214e29ca77.jpg


3af4a083832447a1b215d2ec835dca56.jpg
 
Very nice Matthew, good luck with the extension
 
A slightly revised trackplan, trying to create the ability to sit and watch, or have a bit more operational interest :D

ad58488be47942f5afa55e84aaff65a0.jpg
 
Well, every track plan been drawn up so far has changed now that work has begun :laugh:

Firstly, the new station area has been completed with track virtually layed
5eacc71ed71446188105538efedfeca7.jpg


d75bae5256a4452fa1883ac734f3a7a2.jpg
 
Around the front of the garden, a good 18inches of height had to be found to keep track as level as possible, been alot of work but it's 2/3rd's of the way there now :D

abc948edd9764c6a8b7267f80e3e9038.jpg


96b45bc1c35e4f82bccd9c2248639c29.jpg


b74508b09c174df99ec1a2a2f0325a06.jpg
 
Looking brilliant Matt,nice wood work
 
Thank's Steve :)

Back up to date

Wood protected, both upper and lower level tracks laid/ballasted, station platform part built

7176bea055e8458281ab7547a59b68d1.jpg


04f661ba08934f7e999ed5f9428b0838.jpg
 
Using a decking system to hold the track build up the railway and smarten up the garden is inspired mate well done.

Also loved the pic of the track along side the pond with the train relflection in the water lovely shot mate.

Jason.
 
Well lots of nice weather recently, but not a lot has been run...too busy with other projects :D

Firstly, an old signal box that got started is close to being finished
56b9e2128ba94c70903b8044abb2847a.jpg

8a83b2a1a1184a269af1d34826c949e8.jpg

ed1a9155d58b4236ae30c761e37a3815.jpg
 
Lastly, a large bridge was needed for along side the pond to carry the inner loop, still as yet unfinished (more brickwork and chain needed), but you get the jist :bigsmile:

Overall length is just over 7ft...

ba03b2b770864d3a9d85b9c81f2ec4ac.jpg

3e6b512b995b4692b2006ad54a775043.jpg

6f0b375037844e108b58a051184548b0.jpg
 
Back
Top Bottom