Ralphmp
Registered

I have a couple of bridges on my layout whose installation was approved on the understanding they could be easily removed when no running was taking place. They are currently connected to the tracks either side with some "bridge" clamps I got from Brian at Glendale Junction, and to date these have worked well in ensuring no connectivity issues.
However, being a clumsy so and so, I've found the clamps fiddly to use (I've lost screws on a couple of occasions) and the result is the "easily removable" bridges have tended to become more of a permanent fixture.
I've therefore got to find an alternative way of ensuring connectivity that is simpler for me to connect / disconnect, and I wondered how others have tackled this.
Thanks
However, being a clumsy so and so, I've found the clamps fiddly to use (I've lost screws on a couple of occasions) and the result is the "easily removable" bridges have tended to become more of a permanent fixture.
I've therefore got to find an alternative way of ensuring connectivity that is simpler for me to connect / disconnect, and I wondered how others have tackled this.
Thanks