I have an Accucraft Mogul - about 18 months old, only steamed 6 or so times. I have noticed that for the first 5 minutes or so of each run it is difficult to run other than "light engine" on my track that has a 1 in 25 gradient in parts. During this initial part of a run boiler pressure will not rise above 40 psi, even with the burner turned up. As the run progresses the pressure rises to 60 psi and the burner can be turned down and it will handle a modest load, say 4 AMS/Spectrum wagons over the full layout.
I have also noted that the silver chimney is turning a nice shade of bronze, that might indicate an inordinate amount of heat is going up there rather than heating the boiler. I'm used to this heat discolouration on smoke box doors but not chimneys. I draw off the usual 50 ml from the boiler to allow space for steam to form. Is this part of the problem and should I draw off more prior to steaming or have I other issues that need to be attended to ? I've noticed that it is spitting a small amount of water from its chimney for the first two minutes of running, little or none on initial start up. It has R/C on the regulator alone.
Your thoughts and collective experiences would be most welcome. Max.
I have also noted that the silver chimney is turning a nice shade of bronze, that might indicate an inordinate amount of heat is going up there rather than heating the boiler. I'm used to this heat discolouration on smoke box doors but not chimneys. I draw off the usual 50 ml from the boiler to allow space for steam to form. Is this part of the problem and should I draw off more prior to steaming or have I other issues that need to be attended to ? I've noticed that it is spitting a small amount of water from its chimney for the first two minutes of running, little or none on initial start up. It has R/C on the regulator alone.
Your thoughts and collective experiences would be most welcome. Max.