<p>With all the wet weather we've had it has meant no playing out in the garden which has given me plenty of time to get on with buildings.</p><p>Here is the last of the buildings for Llanfair. Not quite finished yet as I have still to build the awnings over the track but am not quite sure how I am going to do these yet.</p><p>I have used the same method of construction as I did for Llanfair station building. The stone pads on which the goods shed rests are actually stone tiles from a sheet of flooring mosaic I got from Topps Tiles. You get 121 stone squares for £4.99!</p><p>Cheers!</p><p>Keith N. (Nibbs)</p>